ARMY & PRIVATE VEHICLES on PERMATRACK SURFACING
PERMATRACK ROAD OVERLAY
Still resisting heavy armoured tanks after 12yrs wear & tear
PERMATRACK HM Road Surfacing material was laid as a 40mm thick overlay protection layer on a Dorset County Road in 1998. The intention was to prevent the destruction of normal road surfacing whenever the British Army tracked vehicles [Which have to pass over this public road, as part of their driver training programme]
A 40mm thick road surfacing, that can resist a nominal 60 tonne tracked vehicle [like a centurion tank] that is stopped at a halt sign, on an incline, awaiting to turn sharp right, with a learner driver at the controlls, has to be tough. If after eleven years use, with thousands of such vehicles exerting very high shear stresses and still the 40mm thick surface is in very good condition. This material has to be very, very, good.
PERMATRACK HM being a HAPAS CERTIFICATED MATERIAL is one of the toughest materials available
Permatrack is ideal for long lived highway /Overlays / Inlay crack repairs / High stress areas such as Road junctions /Round abouts.
Large road areas, including bridge decks, maybe machine layed to exacting tolerances over varies types of WPM
PERMATRACK HM INLAY REPAIR TAKES THE STRAIN
‘PERMATRACK HIGH MODULAS’ Inlay crack repair system was the preferred material chosen to permanently repair a cracked major trunk road in the HIGHWAY AGENCY’s MACS Area 7.
This high stressed road [A1] requires the toughest of products to effect a long lived repair to the ‘live’ longitudinal crack that is located in the wheel track area. No compromise on quality of materials or workmanship was allowed. The specified inlay crack repair system must be HAPAS approved. Have been previously tried and tested on several of the UK’s most exacting motorways for a number of years past. Ultra heavily trafficked roads such as M4 Heathrow junctions-Contract -14 kilometers of longitudinal cracks. Which we routed out to a profile of 320mm wide x 140mm deep, and this section was fully trafficked within 1 hour of completion. Other contracts RAB have completed include the M6 / A1[M] / T junctions / London’s Waterloo roundabout. These completed contracts are just a sample of PERMATRACK HM inlay crack repairs RAB have completed over the past 9 years.