RAB Associates

February 2009

OVERLAYING PERMATRACK H.M. BRIDGE JOINTS

permatrack-overlay Previously installed Permatrack HM bridge deck joints have over several years been successfully overlaid with new thin road surfacing.

This specification,  allows the highway engineer to have access to several economic and aesthetic advantages.

Suitable for most surfacing materials

No requirement for expensive joint replacement

Reduced traffic management costs

Traffic have a quiet, smooth ride over joints

Minimal future joint maintenance costs

Surface texture / skid resistance is consistent across the whole structure

First used on the Coventry Ring road 2002. 

Currently being installed on the Chiswick Flyover.