| RAB Associates have prepared the following guide to "Bituminous Road Construction Defects: their causes, repair and renovation techniques". We hope you find the information of value and would welcome any feedback. If you wish to discuss anything further please do not hestitate to call us on 01629 814589 or email mike@rab-associates.co.uk |
| Bituminous Road Construction Defects: Their Causes, Repair and Renovation Techniques |
| General Note: In order to design, or even assess, a proposed long lived repair technique, we need to understand some common major influences that cause premature failure of the roadway. These failures often start as being small in area, but unless quickly and correctly treated will ultimately lead to extensive and expensive total or partial major re-lay cost and traffic delays. |
Overview |
| Design: UK highways are, in general, constructed in a simple layered structure, designed to distribute traffic loads efficiently, whilst minimizing the whole-life-cost of the road. |
![]() |
(Fig
1: click
here to see larger picture) |
Sub-Grade:
The Sub-base:
The Base Course:
Surfacing:
Binder course:
Surfacing Layer:
|
Failure Modes And Critical Strains In Bituminous Roads |
![]() |
(Fig
2: click
here to see larger picture) |
| Causes of Failure: |
The
principle criterian for asphalt fatigue is the horizontal tensile
strain at the ‘bottom’ of the bituminous layer. For Subgrade
deformation it is the vertical strain at the top of the subgrade. (See
Fig 2 above). "Thermal Cracking": During periods of cooling, bitumen mixes try to contract. However, asphalt within a road structure is effectively constrained and therefore cannot change its length. As a result, thermal stresses develop. Coupled with traffic imposed stresses, these ‘loads’ may exceed the breaking strength of the bitumen, resulting in a transverse thermal crack. Fig 3 below refers. (Need a solution for Thermal Cracking now? Then click here to jump straight to the solution). |
![]() |
(Fig
3: click
here to see larger picture) |
Load Associated Cracking: When loaded, a bituminous pavement is subjected to tensile stresses. Cracks at the bottom of the bituminous layer can result if:
Repeated loadings will cause the crack to move upwards to the road surface. Fig.4 refers below. (Need a solution for Load Associated Cracking now? Then click here to jump straight to the solution). |
![]() |
Reflective Cracking: Reflective cracking can occur when the daily thermal expansion, or contraction, of the cementitious under layer takes place. These movements induce high tensile strains in the surfacing immediately above cracks or joints. These 'live' cracks propagate upwards to the surface. However, cracks can also be initiated at the surface and move downwards to meet the cracks in the cement bound layer in addition to thermal induced stresses. Fig.5 refers below. (Need a solution for Reflective Cracking now? Then click here to jump straight to the solution). |
![]() |
Shear Stresses: Fig. 4 above refers. Vertical movements between concrete slabs induced by traffic loadings will result in shear, as will vehicle breaking, accelerating and tight radii turning. (Need a solution for Shear Stress Cracking now? Then click here to jump straight to the solution). |
Winter Warping: During winter the upper surfacing, being much colder than the underlying layers, can cause a differential contraction. This allows the concrete slab to warp which induces tensile stress at the surface. Fig 6 refers below. (Need a solution for Winter Warping now? Then click here to jump straight to the solution). |
![]() |
Permanent Deformation (Rutting): These types of problems maybe associated with any individual or combination of the following occurrences:
Fig
7 refers below. (Need a solution for Rutting now? Then click
here to jump straight to the solution). |
![]() |
Available
Repair and Renovation Techniques |
| All of the following materials and techniques have been tested not only in the laboratory but under monitored field trails throughout the UK. We believe that they represent long term solutions to all the problems and failures presented above. |
Thermal Cracking - The Solution Permanite SAMI Suitable for:
RAB Associates recommends "Permanite SAMI". Click here to read how RAB Associates specified and installed the SAMI solution on the A45 recently. To enquire further about the SAMI system please call 01629 814589 or click here to email us. |
Reflective Cracking - The Solution Permanite Permatrack "H" Inlaid System Suitable For:
For those major severe cracks that have traveled through the entire roadbases. Click
here to read how RAB Associates specified and installed the Permatrack
H solution on the A454 Black County Road when its overbridges were suffering
from cracked and leaking transition joints. To enquire further about the
Permatrack H Inlaid System please call 01629 814589 or
click
here to email us. |
|
Permanite Permatrack Infill (with optional anti-skid) Suitable for rutting caused by:
To
enquire further about the Permatrack Infill System please call 01629
814589 or click
here to email us. |
| |