| Construction started on the Coventry City ring road in the 1960’s and continued under several phases until its completion in the 1970’s. This busy ring road provides a quick method for traffic to circumnavigate the city centre. Some time ago the structure was found to be suffering problems caused primarily through leaking road expansion joints. For many years these leaking, overstressed asphaltic plug joints have been allowing saline water to attack the concrete crossheads, reinforcement and beam ends. This structure was rapidly deteriorating and a quick repair to the expansion joints was sought by the engineering staff of the Babtie Consultants Group. |
![]() |
This heavily trafficked road has several elevated sections. These suspended deck levels have an inverted concrete ‘T’ section cross head structure that supports on concrete columns or piers, the bridge beams. This inverted ‘T’ section forms a central upstand, with the bridge beams being located either side of this upstand. This design meant that originally two joints, aprox 1 metre apart, were placed in the road surface so as to accommodate the deck movement. |
| Over the 30 / 40 years of use, the two expansion joints have been repaired several times by ever widening sections of jointing compounds that could not hope to accommodate the imposed loadings. These repaired joints were still leaking and allowing the salt water to attack the original concrete / steel reinforcement and the structure was suffering various degrees of decay. |
![]() |
|
R.A.B.
Associates [UK] Ltd. specified that the two existing joint gaps could be
accommodated with one extra wide joint.
‘PERMATRACK HEAVY DUTY ROAD JOINT’ was chosen as the most economical way in achieving a long lived solution. This highway agency registered joint is able to be installed at any width with a minimum depth of 50mm. It fully retains anti-skid aggregates such as pre-coated chippings. The material has excellent rut resistance even against heavy standing vehicles, and is quick to install in most weather conditions. Having a fast "open to traffic cure" makes this product the ideal repair medium. |
|
Night
time working assured minimum disruption to traffic during the contract
and several large joints per shift could be completed owing to the delivery
of 16 tonnes loads of molten ‘PERMATRACK’ compound. |
![]() |
Completed
joint ready for traffic |